EURL FOR INSECTS AND MITES WORKSHOP 2022
Documentation
The workshop was held at AGES in Vienna, Austria on 29th November 2022. It was organised as hybrid event (face to face and online). This event united 30 representatives of NRLs from the member states, of the EC, EPPO, EFSA and academia. More than 70 viewers followed the workshop via webcast during different sessions. The program encompassed a thorough scientific and educational schedule that included key talks on fruit flies and latest advances in identification of insects by barcoding and HTS. In a closed session, the validation studies on Thaumatotibia leucotreta and the corresponding results of the PTs were presented and discussed. To enhance the collaboration between EURL, EPPO and EFSA, the relevant activities of these organizations were shared with the participants. Selected NRLs introduced themselves, the improvement of internal communication between NRLs and EURL were discussed. We hope, that the workshop contributed to increase networking between the NRLs and the EURL and promoted a harmonized and enhanced diagnostics of quarantine insects.
Thank you all for your participation and we look forward to seeing you all again in 2023!
This material is reserved for NRL staff, we are counting on you to ensure that it is not disclosed outside your laboratory. Thank you for your understanding.
PT 2023-1 Bactrocera dorsalis & B. zonata
Event concluded, final report available
This first proficiency test is organized in 2023 by the Agence nationale de securité sanitaire, de l'alimentation, de l'environnement et du travail (Anses), as part of its activities as a partner of the European Union Reference Laboratory (EURL) for Insects and Mites. The purpose of this test is to evaluate the participating laboratories on their capacity to implement the IPPC DP 29 and EPPO PM 7/114 (1) standarts (or any equivalent method) to identify the adults of B. dorsalis and B. zonata.
Step | Date |
---|---|
Call for registrations | 20/03 |
Registrations closure | 05/04 |
First round | 11-28/04 |
Second round | 09-26/05 |
Third round | 06-23/06 |
Transmission of final report to NRLs | 13/10 |
Transmission of final report to EC and COPHs | 20/10 |
Satisfaction survey analysis and campaign closure | 17/10 |
You must be logged in for downloading the report, click on the button below to proceed
Go to login page